24/7 emergency line · Phone answered · Woodbridge, VA
40+ Years in the Trade Family Owned Residential · Commercial
Plumbing Heating & Air Commercial Residential Service Area About Contact Book Now
Plumbing

Whole House Repipe

A repipe is the right call when the pipe material itself is failing, not when you have had a leak. Those are different problems, and plenty of the calls we get turn out to be the second one.

New water supply lines run through open basement framing during a repipe

Repiping means pulling out the supply piping that feeds every fixture and running new. It is the biggest plumbing job a homeowner ever signs off on, and the one most often sold on a hunch about the year the house was built. Sometimes the real answer is one bad section and a worn pressure-reducing valve, the regulator that sets house pressure where the water comes in.

Three things justify it. A longer list does not.

A repipe earns its keep in three situations. The pipe is a product with a known failure history, which means polybutylene. The pipe is corroding from the inside so the bore is closing, which means galvanised steel. Or pinholes keep appearing in several different runs, which says the pipe is the problem and not one overtightened fitting.

What does not justify it on its own: one leak, a joint that weeps, or rusty water for a minute after the utility flushes a main. Pressure that dropped everywhere is usually that valve, or a main shutoff nobody opened all the way. That is an afternoon.

Galvanised steel: forget the lifespan number

Nearly every plumbing site says galvanised pipe lasts 40 to 50 years. Nothing is behind that figure. It is not in InterNACHI’s life expectancy chart, which has no galvanised row at all, nor in EPA’s distribution system paper. Two peer-reviewed studies decline to give a number and one concludes that galvanising thickness alone does not ensure longevity.

The mechanism is more useful. The pipe is steel under a zinc coating of roughly 40 to 55 micrometres. Water consumes the zinc, the bare steel corrodes, and the corrosion product builds back onto the wall as lumps called tubercles, with deep pits underneath them. EPA describes the same process in water mains and lists what people notice: more leaks, bad taste and odour, red water. The bore closes as the scale grows inward, so pressure falls.

The era is the stronger argument and it is sourced. InterNACHI says galvanised steel was common until the 1950s, so anything still in service has been in those walls past seventy years. Our pipe materials by decade page covers what is in a house of a given vintage.

Polybutylene, and the thing nobody can tell you

Polybutylene was made from 1978 to mid-1995, with production stopping in mid-1996. It is usually stamped PB2110 and most commonly grey, though white, silver, black and blue exist. The stamp and the colour you can check yourself, with a torch in the crawl space.

Why it matters is on the public record. In 1995 a Tennessee court approved a national class action settlement in Cox v. Shell Oil under which Shell and Hoechst contributed $950 million to replumb leaking polybutylene systems, per a Fifth Circuit opinion. The South Carolina Supreme Court records that Celanese and DuPont produced the acetal fittings (Celcon and Delrin) moulded into the joints. Plaintiffs alleged the resin was marketed with a 50-year life while company scientists had reported it would degrade at ordinary chlorine levels. Allegations a court recited are not findings.

Now the part worth knowing before you pay anyone to assess it. No inspection clears polybutylene. InterNACHI is explicit that no tests for weakness should be attempted, because deterioration starts inside the pipe wall and cannot be found without shutting the water off and dismantling it. An inspector can confirm you have it. Nobody can grade it. That asymmetry is the argument for replacing it before it decides the timing for you.

Copper pinholes are a water problem, not an age problem

A Virginia Tech master’s thesis on copper pitting, written under Marc Edwards, reports that in 2004 it was unambiguously proven that water alone could eat a pinhole through copper tube, with no defect and no installation error needed. Treatment changes linked to outbreaks include higher pH and higher chlorine residuals. One outbreak at a large Maryland utility caused leaks in 20 to 50% of the homes it served. That is a thesis rather than a peer-reviewed paper, and we say so.

A peer-reviewed study of Santa Fe tube that leaked after fifteen years found microbes wedged deep inside the pits, and noted that older homes nearby, on the same supply water, had not suffered the same leaks. Same water, same street, different outcome. Which is why our leak detection work starts by cutting out a sample.

What the sources actually say, material by material

MaterialEraWhat a real source says about lifeHow it fails
Galvanised steelCommon until the 1950sNo authoritative figure exists. InterNACHI’s chart has no row for it, and a peer-reviewed study concludes galvanising thickness alone does not ensure longevity.Zinc depletes, steel corrodes, tubercles build inward and close the bore. Pressure falls and the water runs rusty.
Polybutylene1978 to mid-1995, production ending mid-1996. Stamped PB2110, usually grey.Nothing usable. A 50-year claim appears only as a plaintiff allegation recited in court opinions.Oxidants in the supply react with pipe and fittings, which scale, flake and crack from inside. The acetal fittings were implicated in the Cox settlement. No test can grade a run in place.
CopperIn water service since the 1930s. Type K thickest and used underground, Type L the high-quality grade, Type M thinnest and most common indoors. Markings are green for K, blue for L, red for M.Roughly 50 to 70 years per InterNACHI, whose own chart carries both numbers and disclaims them as guidelines rather than warranties.Pitting driven by water chemistry, not by age. Type M has the thinnest wall, so less metal to get through before a pinhole. No source gives Type M a shorter service life.
CPVCStill installedWell in excess of 50 years per the Plastics Pipe Institute, conditioned on correct specification and installation.Stress cracking where an incompatible product touched it. Not chlorine.
PEXStill installed40 years per InterNACHI, against a 50-year minimum extrapolated lifetime from the accelerated lab test in ASTM F2023 per the Plastics Pipe Institute. Different measurements, so they do not average.UV exposure, with limits published per manufacturer and indirect light counting. Historically the fittings rather than the pipe: high-zinc yellow brass can shed its zinc and go porous.

Copper or PEX, and why the fittings decide it

Both are approved and we fit both. The lifespan column does not settle it, because InterNACHI’s field estimate and PPI’s extrapolated lab minimum are not measuring the same thing, and InterNACHI’s two copper rows disagree with each other inside one chart. Look at the failure column instead. A Penn State engineering case study, student work rather than peer-reviewed, walks the PEX pattern: high-zinc brass fittings shedding zinc, going porous, leaking. Same lesson polybutylene taught. These systems fail at the joint, which is why how a house is piped matters more than which material is on the invoice.

Two practical notes. PPI says each PEX manufacturer publishes its own maximum UV exposure limit and that indirect light counts, so pipe left permanently exposed in an unfinished basement gets covered. And copper markings are worth learning: green for Type K, blue for Type L, red for Type M.

The inspection sets your schedule, not the drywall crew

A repipe needs a permit. The 2021 Virginia Uniform Statewide Building Code, effective January 18, 2024, requires one before any alteration involving the water supply and distribution system, at Section 108.1. The ordinary-repairs exemption covers a like-for-like fixture swap that leaves the piping alone, which is the opposite of a repipe.

Then the sequence, which is the most practical thing to understand before you book a painter. Section 113.3 lists the minimum inspections and item five is inspection of plumbing systems prior to concealment. That is the rough-in. Section 113.6 says defective work must be corrected and reinspected before anything conceals it, and a final inspection follows at completion. New pipe in, pressure tested, the county looks while it is open, and only then does drywall close. A contractor offering to close the walls first is offering to open them again.

So a real schedule has a gap in the middle of it. Prince William County wants inspections scheduled by 3 p.m. the working day before, then emails a two-hour arrival window. Fairfax County takes requests up to 11:59 p.m. for the next business day. Section 113.7 is the backstop: if the building official cannot inspect within two working days, third-party reports have to be accepted for review.

On fees, Section 107.1 leaves the schedule to the local governing body, which is why Woodbridge and Alexandria differ. The only statewide piece is a 2.0% levy funding the Virginia Building Code Academy, so there is no state permit fee for a repipe. If the job takes in the line from the meter, Prince William County publishes a residential water service permit at $110.65 including surcharges, effective July 1, 2026, and Fairfax County lists water service at $77.70 against a $141.75 base minimum plus a 10% surcharge. See water line replacement.

Three code items that catch people mid-repipe

  • Thermal expansion control. Code P2903.4 requires a means of controlling the pressure rise from thermal expansion where the service carries a pressure-reducing valve, or a check valve with storage water heating. The house is then a closed system and expanding hot water has nowhere to push. Static pressure is capped at 80 psi.
  • Water hammer arrestors. Virginia amends the code at P2903.5 to require an arrestor conforming to ASSE 1010 where quick-closing valves are used, meaning washer and dishwasher solenoids. The walls are open anyway, so this is the cheapest it will ever be.
  • Pipe in cold places. P2603.5 bars water pipe in an attic or crawl space subject to freezing unless it is protected by insulation or heat. If your old pipe split, routing matters as much as material: see burst and frozen pipe repair.

How the job actually runs

  1. Identify the pipe, not the decadePolybutylene means hunting for the stamp. Galvanised means cutting a sample, because the bore is the argument.
  2. Permit firstOur licence number goes on the application before a pipe moves, under Section 108.4.
  3. Open only what has to openAccess cuts rather than demolition. PEX bends, so it needs fewer openings than copper.
  4. New supply, shutoffs and supportWorking shutoffs at the fixtures and correct support, so nothing drums when a valve closes.
  5. Pressure test, then the inspectionTested while everything is visible, then the rough-in. Nothing is covered before sign-off.
  6. Close and finishDrywall patched to the standard written into the quote. Ask every bidder what that standard is.

When we tell people not to repipe

We have talked homeowners out of this job. A nineties house with copper and one weeping joint needs that joint and a pressure check, not a week of open walls. A pipe that split in a cold snap needs the pipe repaired and the crawl space dealt with. The test is whether the material itself is finished.

Virginia Class A contractor licence #2705131990. Under 18VAC50-22-61 a company cannot hold the plumbing classification unless a master plumber qualifies the licence, which says more than a badge on a van. Family run, 40-plus years in the trade. A person answers at (703) 491-6542 during office hours and Jon takes the after-hours calls himself, though we will not promise a truck at 3am.

Common Questions

How do I tell whether I need a whole house repipe or just a repair?
Whether the material itself is finished, or only one part of it. One leak or one weeping joint is a repair. Leaks in several different runs, a closed-up bore on a cut sample of galvanised, or polybutylene anywhere in the house is another matter.
Will I be without water the whole time?
No. Water goes off during working hours and comes back on in the evening on nearly every job. The thing to ask a bidder about is not the plumbing days but the gap in the middle, because the walls cannot close until the rough-in inspection is signed off.
Does a whole house repipe need a permit in Virginia?
Yes. Section 108.1 of the 2021 Virginia Uniform Statewide Building Code requires a permit before any alteration involving the water supply and distribution system. The fee schedule is set locally, not by the state.
Can the drywall go back before the inspector sees the new pipe?
No, and that is what shapes your schedule. Section 113.3 requires inspection of plumbing systems prior to concealment, and Section 113.6 says defective work must be corrected and reinspected before anything conceals it. Rough-in, then drywall, then a final inspection.
How long does galvanised pipe last?
There is no authoritative answer, which is worth knowing because everyone gives you one. The 40 to 50 year figure is not in InterNACHI’s chart, not in EPA’s distribution system paper, and two peer-reviewed studies decline to give a number. What is sourced is that galvanised was common until the 1950s.
My house has polybutylene but it has never leaked. Can anyone tell me how much life is left?
No. InterNACHI advises that no tests for weakness should be attempted, because deterioration happens inside the pipe wall and cannot be seen without dismantling it. An inspection confirms the pipe is there. It cannot grade it.
Was polybutylene really caused by aluminium crimp rings?
We could not substantiate that. Aluminium is a documented issue in Kitec, a different pipe with an aluminium core, and that litigation is separate. What the court record implicates alongside the resin is the acetal fittings Celcon and Delrin. Manufacturers argued the leaks concentrated at joints instead.
I have a water softener. Does a copper repipe change how I use it?
For the first few weeks, yes. The Minnesota Department of Health advises not running a softener on new copper until the pipe has formed its protective mineral layer, and lists pipe corrosion among softener disadvantages.
Is it true that CPVC goes brittle from chlorine?
The only technical source says the opposite. Plastics Pipe Institute Technical Note TN-62 calls CPVC immune to chlorine degradation. PPI is the plastic pipe trade association, so read it as an industry document, but the documented failure mode is chemical contact with thread sealants, fire-stop, glycol antifreeze or solder flux.
Why do I keep getting pinhole leaks in copper when the house is not that old?
Pinholes are largely a water chemistry story. A Virginia Tech thesis reports it was proven in 2004 that water alone can perforate copper with no defect involved, and a peer-reviewed Santa Fe study found homes on the same supply water with very different outcomes.
Copper or PEX?
Both work. PEX bends, so it needs fewer openings in a finished house and tolerates a freeze better. The published lives do not settle it: InterNACHI says 40 years for PEX against the Plastics Pipe Institute’s 50-year minimum extrapolated lab lifetime, which measure different things. The fittings matter more.
What will the permit cost?
Your locality decides. Section 107.1 puts the fee schedule in the hands of the local governing body and the only statewide element is a 2.0% levy for the Virginia Building Code Academy. Prince William County publishes a residential water service permit at $110.65 including surcharges, effective July 1, 2026.
Book a service call

Tired Of Patching
The Same Pipes?

One call covers plumbing and HVAC. Talk to somebody who has been doing this for decades.

Call (703) 491-6542 Book Online